Off-shore inter-array power cables (IAC)

Off-shore inter-array power cables (IAC)

For off-shore conditions specially dedicated technique has been developed. Based on damped AC (DAC) based technology individual strings between each WTG separately or whole string with several WTGs connected can be tested.

In particular the after-laying test is performed with a PD-monitored withstand testing. This consists of a high voltage test with a predetermined magnitude and duration, and the monitoring of partial discharges to determine the overall cable condition.

The additional information provided by the PD monitoring in combination with the voltage withstand test improves the evaluation of the overall insulation condition of complete IAC strings.

Applying DAC testing of complete IAC strings has the following advantages:

  • provides full information by HV damped AC (DAC) over-voltage testing, PD measurement and localization and tan δ estimation about a complete IAC string,
  • easy transportation, installation and effective application,
  • creates a starting finger print for CBM during operation.

Based on the damped AC (DAC) technology Onsite HV provides a variety of onsite testing solutions for the above-mentioned applications, see the data sheets.