On-site after-laying test (SAT) has the goal to verify the quality of the complete cable system (up to 400 kV). It is a field test performed after the complete cable system installation, including all cable parts, terminations and all types of joints, before the cable system is put into normal service operation.


The after-laying test is performed with a PD-monitored withstand test. This consists of a high voltage test with a predetermined magnitude and duration, and the monitoring of partial discharges to determine the overall cable condition.The combination of a DAC voltage withstand test with PD detection provides information of an insulation weak spot prior to breakdown.
The additional information provided by the PD detection monitoring in combination with the voltage withstand test improves the evaluation of the overall insulation condition, which is crucial for condition-based maintenance (CBM) of power cable systems.
Moreover, the use of DAC testing In case of high-Ω cable breakdowns, DAC testing can be used for less destructive fault localization due to the possibility of PD localization over the complete cable system length. This, in turn, might minimalize the repair time effort for breakdown site localization and possible repair costs.
Based on the damped AC (DAC) technology Onsite HV provides a variety of onsite testing solutions for the above-mentioned applications, see the data sheets.